Back to Report Store Home

Emerging Power Markets in South America and Mexico to 2020 - Changing Competitive Dynamics and Clean Energy Investments Position Brazil and Mexico as Regional Leaders

  • Published: Feb-2013
  • Report Code: GBIPE0027MR
  • Report Format: pdf

Description

List of Tables

1.1 List of Tables

Table 1: South and Central America, Renewable Energy Promotional Policies, 2011

Table 2: Renewable Power Market, South and Central American Countries Clean Energy Investments ($bn), 2006-2011

Table 3: Ease of Doing Business – Categories and Sub-categories

Table 4: Risk Categories for Business

Table 5: Power Market, South and Central American Countries, Relative Scores

Table 6: Power Market, South and Central American Countries, Cumulative Installed Capacity, MW, 2005–2020

Table 7: Power Market, South and Central American Countries, Cumulative Installed Capacity by Type of Power Plant, %, 2012–2020

Table 8: Power Market, South and Central American Countries, Cumulative Installed Capacity by Type of Power Plant, %, 2011

Table 9: Power Market, South and Central American Countries, Total Annual Power Generation and Consumption, GWh, 2005–2020

Table 10: Power Market, Brazil, Geographic Features

Table 11: Power Market, Brazil, Short Term Macro-economic Scenario, 2005–2016

Table 12: Power Market, Brazil, Breakdown of Electricity Consumption, By Sector (%), 2011

Table 13: Power Market, Brazil, Total Annual Imports and Exports (GWh), 2005–2011

Table 14: Power Market, Brazil, Power Consumption (GWh), 2005–2020

Table 15: Power Market, Brazil, Cumulative Installed Capacity by Type of Power Plant (%), 2011

Table 16: Power Market, Brazil, Cumulative Installed Capacity (MW), 2005–2020

Table 17: Power Market, Brazil, Cumulative Thermal Installed Capacity (MW), 2005–2020

Table 18: Power Market, Brazil, Cumulative Hydro Installed Capacity (MW), 2005–2020

Table 19: Power Market, Brazil, Cumulative Nuclear Installed Capacity (MW), 2005–2020

Table 20: Power Market, Brazil, Cumulative Renewable Installed Capacity (MW), 2005–2020

Table 21: Power Market, Brazil, Total Annual Power Generation (GWh), 2005–2020

Table 22: Power Market, Brazil, Annual Thermal Power Generation (GWh), 2005–2020

Table 23: Power Market, Brazil, hydropower Generation (GWh), 2005–2020

Table 24: Power Market, Brazil, Nuclear Power Generation (GWh), 2005–2020

Table 25: Power Market, Brazil, Renewable Power Generation (GWh), 2005–2020

Table 26: Power Market, Brazil, Top Active Thermal Power Plants, 2012

Table 27: Power Market, Brazil, Top Active Hydropower Plants, 2012

Table 28: Power Market, Brazil, Top Active Nuclear Reactors, 2012

Table 29: Power Market, Brazil, Top Active Renewable Power Plants, 2012

Table 30: Power Market, Brazil, Top Upcoming Thermal Power Plants, 2012–2020

Table 31: Power Market, Brazil, Top Upcoming Hydropower Plants, 2012–2020

Table 32: Power Market, Brazil, Top Upcoming Nuclear Reactors, 2012–2020

Table 33: Power Market, Brazil, Top Upcoming Renewable Power Plants, 2012–2020

Table 34: Power Market, Brazil, Length of Transmission Network (Ckm), 2005–2011

Table 35: Power Market, Colombia, Geographic Features

Table 36: Power Market, Colombia, Macro-economic Scenario in the Short-term, 2005–2016

Figure 22: Power Market, Colombia, Breakdown of Electricity Consumption, By Sector (%), 2011

Table 37: Power Market, Colombia, Breakdown of Electricity Consumption, By Sector (%), 2011

Figure 23: Power Market, Colombia , Total Annual Imports and Exports (GWh), 2005–2010

Table 38: Power Market, Colombia, Total Annual Imports and Exports (GWh), 2005–2010

Figure 24: Power Market, Colombia, Annual Power Consumption (GWh), 2005–2020

Table 39: Power Market, Colombia, Annual Power Consumption (GWh), 2005–2020

Figure 25: Power Market, Colombia, Cumulative Installed Capacity by Type of Power Plant (%), 2011

Table 40: Power Market, Colombia, Cumulative Installed Capacity by Type of Power Plant (%), 2011

Figure 26: Power Market, Colombia, Cumulative Installed Capacity (MW), 2005–2020

Table 41: Power Market, Colombia, Cumulative Installed Capacity (MW), 2005–2020

Figure 27: Power Market, Colombia, Cumulative Thermal Installed Capacity (MW), 2005–2020

Table 42: Power Market, Colombia, Cumulative Thermal Installed Capacity (MW), 2005–2020

Figure 28: Power Market, Colombia, Cumulative Hydro Installed Capacity (MW), 2005–2020

Table 43: Power Market, Colombia, Cumulative Hydro Installed Capacity (MW), 2005–2020

Figure 29: Power Market, Colombia, Cumulative Renewable Installed Capacity (MW), 2005–2020

Table 44: Power Market, Colombia, Cumulative Renewable Installed Capacity (MW), 2005–2020

Figure 30: Power Market, Colombia, Annual Power Generation (GWh), 2005–2020

Table 45: Power Market, Colombia, Annual Power Generation (GWh), 2005–2020

Figure 31: Power Market, Colombia, Annual Thermal Power Generation (GWh), 2005–2020

Table 46: Power Market, Colombia, Annual Thermal Power Generation (GWh), 2005–2020

Figure 32: Power Market, Colombia, Annual Hydropower Generation (GWh), 2005–2020

Table 47: Power Market, Colombia, Annual Hydropower Generation (GWh), 2005–2020

Figure 33: Power Market, Colombia, Annual Renewable Generation (GWh), 2005–2020

Table 48: Power Market, Colombia, Annual Renewable Generation (GWh), 2005–2020

Table 49: Power Market, Colombia, Top Active Thermal Power Plants, 2012

Table 50: Power Market, Colombia, Top Active Hydropower Plants, 2012

Table 51: Power Market, Colombia, Top Active Renewable Plants, 2012

Table 52: Power Market, Colombia, Top Upcoming Thermal Plants, 2012–2020

Table 53: Power Market, Colombia, Top Upcoming Hydropower Plants, 2012-2020

Table 54: Power Market, Colombia, Top Upcoming Renewable Power Plants, 2012-2020

Table 55: Power Market, Colombia ,Various Laws/ Decrees in PONURE program

Table 56: Power Market , Colombia, Transmission Network Line Length by Voltage (Ckm), 2005–2011

Table 57: Power Market, Colombia, Expansion Network Plan – in Terms of Expected Capacity and Generation

Table 58: Power Market, Colombia, Distribution Network Line Length by Voltage (Ckm), 2005–2011

Table 59: Power Market, Mexico, Geographic Features

Table 60: Power Market, Mexico, Macro-economic Scenario in the Short-term, 2005–2016

Table 61: Power Market, Mexico, Breakdown of Electricity Consumption, By Sector (%), 2011

Table 62: Power Market, Mexico, Total Annual Imports & Exports (GWh), 2005–2011

Table 63: Power Market, Mexico: Annual Power Consumption (GWh), 2005–2020

Table 64: Power Market, Mexico, Cumulative Installed Capacity By Type of Power Plant (%), 2011

Table 65: Power Market, Mexico, Cumulative Installed Capacity (MW), 2005–2020

Table 66: Power Market, Mexico, Cumulative Thermal Installed Capacity (MW), 2005–2020

Table 67: Power Market, Mexico, Cumulative Hydro Installed Capacity (MW), 2005–2020

Table 68: Power Market, Mexico, Cumulative Renewable Installed Capacity (MW), 2005–2020

Table 69: Power Market, Mexico, Cumulative Nuclear Installed Capacity (MW), 2005–2020

Table 70: Power Market, Mexico, Annual Power Generation (GWh), 2005–2020

Table 71: Power Market, Mexico, Annual Thermal Power Generation (GWh), 2005–2020

Table 72: Power Market, Mexico, Annual Hydropower Generation (GWh), 2005–2020

Table 73: Power Market, Mexico, Annual Renewable Power Generation (GWh), 2005–2020

Table 74: Power Market, Mexico, Annual Nuclear Power Generation (GWh), 2005–2020

Table 75: Power Market, Mexico, Top Active Thermal Power Projects, 2012

Table 76: Power Market, Mexico, Top Active Hydropower Projects, 2012

Table 77: Power Market, Mexico, Top Active Renewable Power Projects, 2012

Table 78: Power Market, Mexico, Top Active Nuclear Power Projects, 2012

Table 79: Power Market, Mexico, Top Upcoming Thermal Power Projects (MW), 2012–2020

Table 80: Power Market, Mexico, Top Upcoming Hydropower Projects, 2012–2020

Table 81: Power Market, Mexico, Top Upcoming Renewable Power Projects, 2012–2020

Table 82: Power Market, Mexico, Length of Transmission Network (Ckm), 2011

Table 83: Power Market, Mexico, Length of Distribution Network (Ckm), 2011

Table 84: Power Market, Argentina, Geographic Features

Table 85: Power Market, Argentina, Macro-economic Scenario in the Short Term, 2005–2016

Table 86: Power Market, Argentina, Breakdown of Electricity Consumption, By Sector (%), 2011

Table 87: Power Market, Argentina, Total Annual Imports and Exports (GWh), 2005–2010

Table 88: Power Market, Argentina, Annual Power Consumption (GWh), 2005–2020

Table 89: Power Market, Argentina, Cumulative Installed Capacity by Type of Power Plant (%), 2011

Table 90: Power Market, Argentina, Cumulative Installed Capacity (MW), 2005–2020

Table 91: Power Market, Argentina, Cumulative Thermal Installed Capacity (MW), 2005–2020

Table 92: Power Market, Argentina, Cumulative Hydro Installed Capacity (MW), 2005–2020

Table 93: Power Market, Argentina, Cumulative Nuclear Installed Capacity (MW), 2005–2020

Table 94: Power Market, Argentina, Cumulative Renewable Installed Capacity (MW), 2005–2020

Table 95: Power Market, Argentina, Annual Power Generation (GWh), 2005–2020

Table 96: Power Market, Argentina, Annual Thermal Power Generation (GWh), 2005–2020

Table 97: Power Market, Argentina, Annual Hydropower Generation (GWh), 2005–2020

Table 98: Power Market, Argentina, Annual Nuclear Power Generation (GWh), 2005–2020

Table 99: Power Market, Argentina, Annual Renewable Power Generation (GWh), 2005–2020

Table 100: Power Market, Argentina, Top Thermal Power Projects, 2012

Table 101: Power Market, Argentina, Top Hydropower Projects, 2012

Table 102: Power Market, Argentina, Top Nuclear Power Projects, 2012

Table 103: Power Market, Argentina, Leading Renewable Power Projects, 2012

Table 104: Power Market, Argentina, Top Upcoming Thermal Power Projects, 2012–2020

Table 105: Power Market, Argentina, Top Upcoming Hydropower Projects, 2012–2020

Table 106: Power Market, Argentina, Top Upcoming Nuclear Power Projects, 2012–2020

Table 107: Power Market, Argentina, Top Upcoming Renewable Power Projects, 2012–2020

Table 108: Power Market, Argentina, Length of Transmission Network by Voltage (Ckm), 2005–2011

Table 109: Power Market, Argentina, Length of Distribution Network by Voltage (Ckm), 2005–2020

Table 110: Power Market, Argentina, Distribution Companies, 2011

Table 111: Power Market, Chile, Geographic Features

Table 112: Power Market, Chile, Macro-economic Scenario in the Short Term, 2005–2016

Table 113: Power Market, Chile, Estimated Breakdown of Electricity Consumption, by Sector (%), 2011

Table 114: Power Market, Chile, Total Annual Imports (GWh), 2005–2011

Table 115: Power Market, Chile, Annual Power Consumption (GWh), 2005–2020

Table 116: Power Market, Chile, Cumulative Installed Capacity, Breakdown by Type of Power Plant (%), 2011

Table 117: Power Market, Chile, Cumulative Installed Capacity (MW), 2005–2020

Table 118: Power Market, Chile, Cumulative Thermal Installed Capacity (MW), 2005–2020

Table 119: Power Market, Chile, Cumulative Hydro Installed Capacity (MW), 2005–2020

Table 120: Power Market, Chile, Cumulative Renewable Installed Capacity (MW), 2005–2020

Table 121: Power Market, Chile, Annual Power Generation (GWh), 2005–2020

Table 122: Power Market, Chile, Annual Thermal Power Generation (GWh), 2005–2020

Table 123: Power Market, Chile, Annual Hydropower Generation (GWh), 2005–2020

Table 124: Power Market, Chile, Annual Renewable Power Generation (GWh), 2005–2020

Table 125: Power Market, Chile, Top Active Thermal Projects, 2012

Table 126: Power Market, Chile, Top Active Hydropower Projects, 2012

Table 127: Power Market, Chile, Top Active Renewable Power Projects, 2012

Table 128: Power Market, Chile, Top Upcoming Thermal Power Projects, 2012–2020

Table 129: Power Market, Chile, Top Upcoming Hydropower Projects, 2012–2020

Table 130: Power Market, Chile, Top Upcoming Renewable Power Projects, 2012–2020

Table 131: Power Market, Chile, Length of SING Transmission Lines by Voltage (km), 2009

Table 132: Power Market, Chile, Length of SIC Transmission Lines by Voltage (km), 2009

License Details
Electronic PDF copy delivered via email. Report can be used by individual purchaser only.
Single User Licence
$1000
Electronic PDF copy delivered via email. Report can be shared by unlimited users within one corporate location, e.g. a regional office.
Site Licence
$2000
Electronic PDF copy delivered via email. Report can be shared globally by unlimited users within the purchasing corporation e.g. all employees of a single company.
Global Licence
$3000
Email to a colleague Enquire Before Buying
Prefer to speak to a team member? Call us on:
+44 161 359 5414
Or click here to contact us
Secure Payments
Cards